Van Buren High School in Arkansas, with an 80′ wide x 25′ high curved stage opening, was looking for a main curtain in a Venetian style. Harvest Productions of Kansas City came to IWEISS to design and build a motorized curtain system that allows for multiple looks. Our solution was a pre-assembled modular truss system utilizing 14 custom 1/2 HP Yo Yo Winches each with an encoder and limit switch for individual control. Working with JR Clancy’s Control Division, the system operates from an easy to use touch pad screen and allows each of the (14) lift lines to have seven positions with a variable speed of up to 3ft/sec.
Van Buren High School – Van Buren, AR
Schools